BACKGROUND

The city of Virginia Beach identified Lesner Bridge for replacement due to structural deficiency and obsolete functionality. With extensive corrosion and heavy traffic on the bridge, SINE WALL was contracted to quickly and efficiently complete this vital project.


CONTRACTOR

INFRASTRUCTURE OWNER

CHALLENGES

Marine environment with proximity to Atlantic Ocean and potential for flooding, high construction loading.

RESULT

SINE WALL enabled quick replacement of a marquee bridge in a popular residential and tourist location with timely drawing submittals and material delivery. SINE WALL also focused on enhancing the aesthetics and landscape of this stretch of Shore Drive using a custom wave pattern.

LESNER BRIDGE REPLACEMENT

GET IN TOUCH

To learn more about this project and our engineered systems, please follow the link below.

Contact Us