BACKGROUND

This design build project was situated in a flood plain which required the settlement to be closely monitored as the walls were installed. With cost a primary concern, Rosch Company chose SINE WALL for design and build of both panel and wire walls.


Design Build

CONTRACTOR

INFRASTRUCTURE OWNER

CHALLENGES

Settlement, staged construction, permanent wire walls

RESULT

SINE WALL engineers were challenged to compete with differential settlement and staged construction to provide cost effective solutions to the design team. The project was completed on schedule for the Missouri Department of Transportation, with SINE WALL delivering the desired balance between price and aesthetics.